ControlTap contracting company is pleased to announce the completion of our new project with AlBabtain company

(AlBabtain warehouse project 3rd industrial city Dammam), ControlTap flooring team executed 6,000 m2 using the steel fiber reinforced concrete technology  supplied by FORCETECH steel fiber company to guarantee high quality.

FORCETECH has extensive experience in steel fiber manufacturing that earned a very strong reputation in such a short time among both domestic and foreign markets.

ControlTap MEP department  executed HVAC system,Plumbing /Gas system, Fire Fighting system, Electrical system.

Our MEP scope of work including the flowing:

HVAC
Supply and install all the AC unit.

Supply and install all the Excuse Fan.

PLUMBING/GAS

Supply and install all the pipe & fitting for water supply.

Supply and install all the pipe & fitting for derange.

Supply and install water pump.

Supply and install all the sanitary fixture.

 Fire Fighting

Supply and install fire fighting pipe.

Supply and install fire pump.

 ELECTRICAL

Supply and install all the PVC & EMT conduit.
Supply and install all the wiring and cable.
Supply and install all the wiring device.
Supply and install all the lighting fixture.
Supply and install all the panel board.