Scope of Work:
- Power distribution network
- Lighting system
- Low current system (BMS, FA, CCTV, Etc.)
- Complete firefighting & alarm system for Flammable Materials in production Area includes (FM-200 & CO2 System, deluge foam system)
- Utilities Work for Production Area & Offices & Site works (Plumping & Drainage network & Compressed Air Piping & Equipment’s)
- HVAC System (Chilled water system with Air Handling Units & FCU’s)
Value: 6,600.000 SAR
Built Up Area: 12,000 Sq. m
Project includes: GF+MF+RF (Admin & Production Area)