Scope of Work:
- Complete firefighting & alarm system for Flammable Materials in production Area includes (FM-200 & CO2 System, deluge foam system)
- HVAC System (Chilled water system with Air Handling Units & FCU’s)
- Utilities Work for production Area & offices & Site works (Plumping & drainage network & Compressed Air Piping & Equipment’s)
- Power distribution network
- Lighting system
- Low current system (BMS, FA, CCTV, Etc.)
Value: 6 ,000.000 SAR
Built Up Area: 55,000 Sq.m
Project includes GF+RF (Admin & Production Area)